PAE was initially active in the trade and supply of refinery and drilling equipment for oil and gas hardware industry, electrical and instrumentation material and installation, commissioning. In 2007 PAE became an EPCI (Engineering, Procurement, Construction and Instllation) and service to a majoritydevelopment program infrastructure requirement and other constructionphase through project entrusted to them.

News Update

  • PLTS

    Pembangunan Pembangkit Listrik 65 MW...

    CDC System

    Supply, Renting and Maintaince CDC System. The system Used to powered BTS in Total Area....

    Scattered Island Project PLN

    We are become PT Infrastrutur Telekomukasi Indonesia Sub Contractor. Delivered and Instalation 1 Mega Watt Mitsubishi Generator System Total Project 147 Mega Watt....